{"id":1894,"date":"2018-01-10T12:20:45","date_gmt":"2018-01-10T12:20:45","guid":{"rendered":"http:\/\/www.deltahv.co.uk\/?p=1894"},"modified":"2020-07-03T08:53:26","modified_gmt":"2020-07-03T07:53:26","slug":"132kv-11kv-substation-build","status":"publish","type":"post","link":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/","title":{"rendered":"132kV\/11kV Substation Build"},"content":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text]72MVA at 132KV with a 7km 132kV cable route connected to UKPN network<\/p>\n<h3>Scope \u2013 Project manage, install, build and commission<\/h3>\n<p>The data centre site consists of a 72 MW feed via a 7.2km duel cct cable route fed from UKPN.<\/p>\n<p>We had been appointed to act as on-site project manager for the build with the management of procurement, installation of the below descriptive works and commissioning, all of which had been complete within our remit of the scope.<\/p>\n<p>The project was completed on time and to the satisfaction of all duty holders including the local DNO.[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<h3>Description and overview of works \u2013 Installation, build and commissioning<\/h3>\n<ul>\n<li>Earthing<\/li>\n<li>Protection panel installation<\/li>\n<li>HV cable jointing and terminations (specialist manufacture terminations included)<\/li>\n<li>Multicore &amp; telecontrol cable installation termination &amp; testing<\/li>\n<li>Plant and equipment installations (Grid TX\u2019s, AUX TX\u2019s, NER\u2019s, GIS switchgear, AIS switchgear, protection panels, LVAC panel and battery chargers<\/li>\n<li>SCADA panel installation and testing<\/li>\n<li>Installation of active harmonic filters including the civils and enabling works, with the integration with existing systems<\/li>\n<li>Problem solving, protection design reviews and settings configurations\/ implementations<\/li>\n<li>Final onsite testing and commissioning of plant and protection schemes with final completion to energisation<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text]72MVA at 132KV with a 7km 132kV cable route connected to UKPN network Scope \u2013 Project manage, install, build and commission The data centre site consists of a 72 MW feed via a 7.2km duel cct cable route fed from UKPN. We had been appointed to act as on-site project manager for the build&hellip;<\/p>\n","protected":false},"author":1,"featured_media":2068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-1894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-study","category-16","description-off"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>132kV\/11kV Substation Build - Delta HV<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"132kV\/11kV Substation Build - Delta HV\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text]72MVA at 132KV with a 7km 132kV cable route connected to UKPN network Scope \u2013 Project manage, install, build and commission The data centre site consists of a 72 MW feed via a 7.2km duel cct cable route fed from UKPN. We had been appointed to act as on-site project manager for the build&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/\" \/>\n<meta property=\"og:site_name\" content=\"Delta HV\" \/>\n<meta property=\"article:published_time\" content=\"2018-01-10T12:20:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-03T07:53:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection-1024x571.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"571\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"tombuttle\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"tombuttle\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/\",\"url\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/\",\"name\":\"132kV\/11kV Substation Build - Delta HV\",\"isPartOf\":{\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection.png\",\"datePublished\":\"2018-01-10T12:20:45+00:00\",\"dateModified\":\"2020-07-03T07:53:26+00:00\",\"author\":{\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/#\/schema\/person\/1b7c59873615748978493d1558a595cf\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#primaryimage\",\"url\":\"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection.png\",\"contentUrl\":\"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection.png\",\"width\":1674,\"height\":933},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.deltahv.co.uk\/hv\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"132kV\/11kV Substation Build\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/#website\",\"url\":\"https:\/\/www.deltahv.co.uk\/hv\/\",\"name\":\"Delta HV\",\"description\":\"Power Services\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.deltahv.co.uk\/hv\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/#\/schema\/person\/1b7c59873615748978493d1558a595cf\",\"name\":\"tombuttle\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.deltahv.co.uk\/hv\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/661d3c687879d21164763446b3e0242c65220d850d19835f0fed7940019bb48a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/661d3c687879d21164763446b3e0242c65220d850d19835f0fed7940019bb48a?s=96&d=mm&r=g\",\"caption\":\"tombuttle\"},\"url\":\"https:\/\/www.deltahv.co.uk\/hv\/blog\/author\/tombuttle\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"132kV\/11kV Substation Build - Delta HV","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/","og_locale":"en_GB","og_type":"article","og_title":"132kV\/11kV Substation Build - Delta HV","og_description":"[vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text]72MVA at 132KV with a 7km 132kV cable route connected to UKPN network Scope \u2013 Project manage, install, build and commission The data centre site consists of a 72 MW feed via a 7.2km duel cct cable route fed from UKPN. We had been appointed to act as on-site project manager for the build&hellip;","og_url":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/","og_site_name":"Delta HV","article_published_time":"2018-01-10T12:20:45+00:00","article_modified_time":"2020-07-03T07:53:26+00:00","og_image":[{"width":1024,"height":571,"url":"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection-1024x571.png","type":"image\/png"}],"author":"tombuttle","twitter_card":"summary_large_image","twitter_misc":{"Written by":"tombuttle","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/","url":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/","name":"132kV\/11kV Substation Build - Delta HV","isPartOf":{"@id":"https:\/\/www.deltahv.co.uk\/hv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#primaryimage"},"image":{"@id":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection.png","datePublished":"2018-01-10T12:20:45+00:00","dateModified":"2020-07-03T07:53:26+00:00","author":{"@id":"https:\/\/www.deltahv.co.uk\/hv\/#\/schema\/person\/1b7c59873615748978493d1558a595cf"},"breadcrumb":{"@id":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#primaryimage","url":"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection.png","contentUrl":"https:\/\/www.deltahv.co.uk\/hv\/wp-content\/uploads\/sites\/1\/2018\/12\/Crawley-Data-Centre-Connection.png","width":1674,"height":933},{"@type":"BreadcrumbList","@id":"https:\/\/www.deltahv.co.uk\/hv\/blog\/2018\/01\/10\/132kv-11kv-substation-build\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.deltahv.co.uk\/hv\/"},{"@type":"ListItem","position":2,"name":"132kV\/11kV Substation Build"}]},{"@type":"WebSite","@id":"https:\/\/www.deltahv.co.uk\/hv\/#website","url":"https:\/\/www.deltahv.co.uk\/hv\/","name":"Delta HV","description":"Power Services","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.deltahv.co.uk\/hv\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.deltahv.co.uk\/hv\/#\/schema\/person\/1b7c59873615748978493d1558a595cf","name":"tombuttle","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.deltahv.co.uk\/hv\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/661d3c687879d21164763446b3e0242c65220d850d19835f0fed7940019bb48a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/661d3c687879d21164763446b3e0242c65220d850d19835f0fed7940019bb48a?s=96&d=mm&r=g","caption":"tombuttle"},"url":"https:\/\/www.deltahv.co.uk\/hv\/blog\/author\/tombuttle\/"}]}},"_links":{"self":[{"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/posts\/1894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/comments?post=1894"}],"version-history":[{"count":8,"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/posts\/1894\/revisions"}],"predecessor-version":[{"id":2215,"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/posts\/1894\/revisions\/2215"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/media\/2068"}],"wp:attachment":[{"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/media?parent=1894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/categories?post=1894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.deltahv.co.uk\/hv\/wp-json\/wp\/v2\/tags?post=1894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}